Project

General

Profile

Actions

roos-fs tasks #696

open

[BUG]Issues with the 'Lead Details' page.

Added by Olena Tretjakova 6 months ago. Updated 5 days ago.

Status:
Closed
Priority:
Normal
Assignee:
Start date:
11/07/2025
Due date:
% Done:

0%

Estimated time:

Description

Environment: Staging.

Expected Result:

  1. All containt is translated to German, when the German language is selected.
  2. Clicking the 'Back' button redirects to 'the 'Leads' page.
  3. The 'View' icon should perform an action or be removed.

Actual Result:

  1. The records about status changes are not translated into German.
  2. Clicking the 'Back' button on the 'Lead Details' page does not redirect to the 'Leads' page (when the page is switched to German).
  3. The 'View' icons in the 'Activity Log' section do not perform any action.

Steps to Reproduce:

  1. Open the 'Lead Details' page. Change the Status for current Lead. Click the 'De' button to translate to German.
  2. The 'Activity Log' section contains records (describing status changes) displayed in English instead of the selected language.https://screenrec.com/share/I8KSEQlhaw
  3. Switch to German (click the 'De' button). Click the 'Delete' button. The warrning alert about the Lead will be deleted appears in English. https://screenrec.com/share/lcn1bkyGHF
  4. Open the 'Lead Detail' page in English. Switch the language using the 'De' button. Click the 'Zuruck(Back)' button.
  5. The same page remais only in English instand to redirecting to the 'Leads' page.https://screenrec.com/share/4YgOW6ZJzA
  6. Click a 'View' icon next to each of records in the 'Activity Log' section no action ossurs.
Actions #1

Updated by Olena Tretjakova 6 months ago

  • Status changed from Deployed (QA) to Open
Actions #2

Updated by Vadim Pariev 6 months ago

  • Status changed from Open to Backlog
Actions #3

Updated by Vadim Pariev about 2 months ago

  • Assignee changed from Vadim Pariev to Volodymyr Kuzmych
Actions #4

Updated by Vadim Pariev about 2 months ago

  • Status changed from Backlog to Open
Actions #5

Updated by Volodymyr Kuzmych about 2 months ago

  • Status changed from Open to In progress
Actions #6

Updated by Volodymyr Kuzmych about 2 months ago

  • Status changed from In progress to In review
  • Assignee changed from Volodymyr Kuzmych to Danyl Kozub
Actions #7

Updated by Vadim Pariev 24 days ago

  • Status changed from In review to Closed
Actions #8

Updated by Vadim Pariev 24 days ago

Open. A follow up for the rework of the activity log

Actions #9

Updated by Danyl Kozub 14 days ago

  • Assignee changed from Danyl Kozub to Volodymyr Kuzmych
Actions #10

Updated by Vadim Pariev 13 days ago

  • Assignee changed from Volodymyr Kuzmych to Vadim Pariev
Actions #11

Updated by Albert Katasonov 5 days ago

  • Project changed from 8 to Roos-fs-ZIP
  • Category deleted (Bug)
Actions

Also available in: Atom PDF