roos-fs tasks #129
open
Check lists creation (sub form for the Task)
Added by Vadim Pariev 11 months ago.
Updated 5 days ago.
Description
User story
As a Admin user, I want to create and manage customizable checklist in a task,
so that I can define structured tasks or forms with different entry types, reorder them, and reuse or edit them as needed.
Acceptance Criteria:
Checklist Creation:
-User can create a new checklist in the task.
-Each checklist consists of multiple entries.
-user can delete the check list
Entry Configuration:
Each entry should support:
- Name: Title/label of the entry (text input).
Type: Choose one of the following:
- Text Field
- Boolean Question (Yes/No)
- Multiple Selection List (with definable options)
- Take a Photo (image upload from mobile device)
Position: Ability to define/reorder the position of the entry within the checklist (drag-and-drop).
Checklist Editing:
- Users can edit the name of the checklist and modify, delete, or reorder existing entries.
- Users can add new entries to an existing checklist.
Checklist Saving:
-
All changes must be saved persistently (backend).
-
Saved checklists can be retrieved and edited later.
Data Validation:
-
Entry name is required.
-
Entry type must be selected.
-
For multiple selection type, at least one option must be defined.
Further Requirements
- all values given in the frontend from the mobile user shall be saved and be visible in the task (in the instruction subsection)
Files
- Assignee set to Farzam Azhar
- Description updated (diff)
- Description updated (diff)
- Status changed from Backlog to Open
- Estimated time set to 16:00 h
- Estimated time deleted (
16:00 h)
- Assignee changed from Farzam Azhar to Alex Katasonov
- Status changed from Open to In progress
- Estimated time set to 12:00 h
- Status changed from In progress to In review
- Status changed from In review to In progress
requirement not met
- Position: Ability to define/reorder the position of the entry within the checklist (drag-and-drop).

- Status changed from In progress to In review
- Status changed from In review to In progress
- Status changed from In progress to Deployed (QA)
- Status changed from Deployed (QA) to In progress
- Status changed from In progress to Deployed (QA)
- I can not arrange the items in the check list
- there is no responce from the system when i sucsessfully created a task + the user shall be redirected to the tasks list (altough not stated, iе is common sence)
- entries in the checklist are not saved
STR
- go create a fresh task/edit eixisting
- create a couple of fields in the checklist
- click on update the task/create a task
As you may see the entries are not saved
- Status changed from Deployed (QA) to In progress
- Status changed from In progress to Open
- Status changed from Open to Deployed (QA)
- Status changed from Deployed (QA) to In progress
- Status changed from In progress to Deployed (QA)
- Status changed from Deployed (QA) to Closed
- Project changed from 8 to Roos-fs-ZIP
Also available in: Atom
PDF